Monday, December 7, 2009

So...this is the plan


OK, this is Plan A. To try and keep costs down, I'm keeping as much as the original framing, windows and door positionings as possible. Currently, there's a huge opening at the front, which will need to be closed in, windows along the right wall, which will stay, and windows at the back which will be partially enclosed and turned into French Doors. This will all be open plan, with the services to the outside walls to keep costs down.


Like my drawings? Created it on some US website and then imported it into PowerPoint...oh so professional.